For those who want a profession in quality testing, the Six Sigma Green Belt question bank is for you. With the Six Sigma Green Belt exam, you can test yourself on concepts covered in quality testing like using Minitab for statistical analysis. People who need to learn methodically can take this test multiple times and will benefit from these lean six sigma green belt exam questions and answers. This six sigma green belt test can be tried numerous times and is free of cost. Go ahead, give this exam a go today!

  • 100 Questions,
  • 180 Minutes
Related course

Certified Lean Six Sigma Green Belt

The Lean Six Sigma Green Belt Certification program is the second stage in the Lean Six Sigma Masters program. You’ll learn the core p ...

Get 30% DiscountCoupon will be auto applied. GO TO COURSE
Instructions:

1. This is a FREE test and can be attempted multiple times. But it is recommended to take the test when you are ready for best practice experience.

2. Test Duration: 180 Minutes

3. Number of questions: 100 Multiple Choice Questions

4. Each question has multiple options out of which one or more may be correct

5. You can pause the test in between and you are allowed to re-take the test later. Your test will resume from where you left, but the test time will be reduced by the amount of time you've taken in the previous attempt.

Please fill the form below to start the Practice Test
Name*
Email*
+91-
Phone Number*
{{seconds | secondsToDate | date:'HH:mm:ss'}} Time remaining
1. What is the key benefit of multi-vari charting?
2. Deciding to collect sample from a population is often:
3. A Six Sigma project had a lot of improvement measures suggested on training people, setting standardized job instructions, getting surveys done from employees, and so on. Who would be the focused audience for whom this project was aimed at?
4. Cause and Effect Diagram when used with 5 WHY helps you in understanding the root cause of the problem. In doing so, what does the Six Sigma team wish to know?
5. Which of the below mentioned tools is considered best to inform employees of their work roles, in terms of ease of understanding and implementation?
6. In embracing Six Sigma, what has been the principal motivating factor from the point of view of upper management ?
7. The purpose of "rolled throughput yield" in Six Sigma would NOT be to:
8. A company making rubber tires is evaluated on 5 opportunities per product; in 1000 products manufactured in a month if 100 defects are observed, the Rolled Throughput Yield is:
9. What is Lean philosophy?
10. When samples are drawn out of a population randomly, what is said to be true?
11. Which of the following tools is most commonly used in the define phase of a project?
12. Which of these is considered a technique to collect data or comments from customers?
13. Which of the following cannot be considered as an acceptable reason for deploying a Six Sigma DMAIC project?
14. Sum Square of Error is equal to:
15. The p value for Moods Median test is .02 and the level of significane is set at .05, what decision is made?
16. What type of waste would the following scenario potentially cause? A clothing manufacturing is producing more items than what the customer has ordered.
17. Which of the following variations are identified in control charts?
18. Which of the following tools helps in visualizing series of causes to an effect?
19. Which of the following statistical tests should be used by the Green Belt for testing the means between two inter-related groups?
20. Standard Deviation in Six Sigma applications is referred to as difference from the:
21. In a typical DFSS Approach, which of these stages figures in most DFSS approaches?
22. Which of the following pairs is the most useful in preparing control charts, when used together, for variables data?
23. Which of the following activities is NOT non value-added?
24. Repetition helps the Six Sigma team in determining:
25. Identify the most accurate method for quantifying gage repeatability and reproducibility.
26. Which of these tools / techniques represent "continuous improvement"?
27. A Six Sigma project can reduce:
28. Why would Six Sigma activities prompt a re-analysis of measuring systems?
29. Japanese 5S methodology is created and used for:
30. What does OEE stands for?
31. The house of quality is used to translate customer wants into engineering design variables. The linking or prioritization of customer wants into engineered values occurs in which of the following elements?
32. What is the name of the condition if you are running a 7-4 fractional experiment? You know factors A, B, C, D, and E are independent of each other, but you suspect factors F and G are not independent. You conducted a small sub-experiment and discovered a high correlation between factors F and G.
33. Most of the modern computer programs can perform an analysis of experimental residuals. Which of the following techniques will NOT be employed?
34. If an experiment has an alias, you could say that the two factor effects are:
35. What types of variation does a process have if it is "in control"?
36. For 4 factors and 3 levels, the DOE setup has 32 runs. What type of experiment is being conducted?
37. Which of the following techniques used in DOE helps you in identifying pure error?
38. A combined calculation of repeatability and reproducibility using the average and range method produces a ratio of 7.42% of process tolerance. What can be stated about the 7.42% value?
39. In a single factor ANOVA, the assumption of homogeneity of variances applies to:
40. A perfect regression model with all points fitting the regression line has Sum Square of Errors ______
41. A QFD template allows the Six Sigma team to learn which of the following?
42. What are the six experiments called while performing one experiment with four repetitions?
43. If men having high Blood Sugar problems are diagnosed with Diabetes, with the mean blood sugar level to be at 120 and a standard deviation of 9, and any individual having greater than 100 Blood Sugar levels can be diagnosed with Diabetes, what is the probability of committing a Type II Error?
44. A Six Sigma Green Belt practitioner constructs a control chart to display a process mean and its outer limits. In such a chart, what does UCL stand for?
45. To optimize the response of a process, ideally what sequence of experimentation should one use?
46. Whichof the following terms describes the situation in which the effects of two factors are correlated while designing experiments?
47. What is the process capability for attribute data?
48. An organization finds that an extra measure of security added to online transactions did not reduce the incidence of identity theft. What is this concept of management referred to?
49. Which of the following statements are NOT true of control charts?
50. Rolled Throughput Yield best indicates:
51. For a full factorial experiment with 23 treatments and 0 replicate, how many runs could you expect?
52. What set of basic quality tools would be most applicable for a work team to use when there is a desire to follow procedures and work instructions more closely?
53. Hypothesis tests on enumerative statistics would NOT involve which of the following distributions?
54. One of the purposes of using a fishbone diagram is to:
55. Which of the following control charts would best fit a process in which measurement data on a product is easily obtained?
56. With which of the following distributions is the term "degrees of freedom" inapplicable?
57. What determines the factors that will receive major attention after constructing a rank order prioritization matrix?
58. Which of the following is an example of a Primary metric for Six Sigma projects?
59. What skills and experiences do project improvement team members normally have?
60. What type of variation is undesirable when trying to control a process?
61. An engineer is considering a fractional factorial instead of a full factorial to analyze a process because of the large number of variables under study. Apart from the possibility of studying a large number of factors with relatively few experiments, what other characteristic will support a decision to use a fractional factorial instead?
62. The difference between strategic quality goals and the strategic business plan is that:
63. Identify the post-improvement tool which would be most beneficial when generating fresh ideas after the results of an improvement process have been disappointing.
64. Which of the following errors is typically associated with the notion, "False negative"?
65. When the data has outliers, which of the measures of central tendency should be used?
66. What type of waste is "an accountant going to the first floor to pick up documents from printer"?
67. What is the best choice in the hands of a Six Sigma team to increase the power of the experiments?
68. Which hypothesis test is similar to the 1 sample t-test but is used when the data set is non-normal?
69. Which approach talks about equipment effectiveness?
70. What is the more appropriate definition of Non-Value-Add Activity?
71. Best metric for measuring defectives is:
72. If the Measure stage in a DMAIC approach is all about measuring the data for existing process, what is the main objective in the Measure phase in a DFSS approach?
73. All the factors that might contribute to a production problem must be discovered. Which among the following problem-solving tools might be the best choice?
74. One thousand units of a product were examined for the possibility of 5 different undesirable characteristics. A total of 80 defects were found. How many defects would be expected in a million opportunities?
75. On a highly automated food processing line, a quality professional wants to chart the weight of packages. The recommended control chart is an X-bar - S chart and not the typical X-bar - R chart, in wide use throughout the facility. Which of the following is the most logical reason for this switch?
76. Variable control chart subgroup sizes are generally 3, 4, 5, or 6 for all of the following reasons EXCEPT:
77. Which of the following measures of central tendency is prefered when the data does not have outliers?
78. Poke Yoke is a lean manufacturing concept that is used for what purpose?
79. Which of the following assumption is necessary to validate the meaning of the standard deviation of measurement variability?
80. For many people, changing a single tire can easily take 15 minutes. But, for a NASCAR pit crew, changing four tires takes less than 15 seconds. This represents good use of what tool?
81. In a study of probability, an event or outcome that cannot be broken down any further is referred to as:
82. As a Green Belt, what should a trainee do when he faces a problem during his projects?
83. Which of these distributions can be used to make inferences about population variances?
84. Which of the following is the LEAST likely tool to assist the problem definition stage of Six Sigma?
85. For a process working at 5 Sigma level, how many opportunities are considered to lie outside of the specification limits provided by the customer?
86. In a typical Measure Phase, which of the following activities should a Green Belt perform first?
87. In a typical MSA GAGE RR study conducted, what should the Six Sigma team determine about the Measurement System first?
88. Which of the following scenarios is best suited to use an X-bar and R chart?
89. If 6 consecutive samples were taken from a process and precisely measured, you can still expect differences. What type of variation would be the most difficult one to determine?
90. What is one basic assumption of a null hypothesis?
91. As an experienced experimenter, you have built a predictive model of an experimental data. The difference between the actual response data and the model data are termed as:
92. In the theory of control charts, the distribution of the number of defects per unit follows which of the following distributions?
93. What type of waste is "Purchasing and storing office supply, sales literature, etc."?
94. For a Six Sigma project done in the Operations department (LOB project), which of the following could be called a stakeholder to the project?
95. Which item should not be identified in the Define Phase?
96. Distribution that follows principles of an exponential distribution is:
97. While considering the stakeholder groups, which of the following terms is closely identified with the term 'community'?
98. Poka-yoke is best defined as:
99. Which of the following is NOT necessary for the Six Sigma team to update in the Project Charter in the Define Phase?
100. Which of the following distributions describes the ratios of two variances drawn from the same normal population?
{{ seconds | secondsToDate | date:'HH:mm:ss'}} Time remaining
NOTE

All test progress will be lost in case you close the browser without finishing the test. Please finish the test to access your results.

Frequently Asked Questions

  • What is a Six Sigma Green Belt practice test?

    The Six Sigma Green Belt practice test is a mock version of the Lean Six Sigma Green Belt certification exam conducted by IASSC. This practice test involves 100 multiple choice questions based on all the important topics covered in the actual exam. You can check the level of your preparation in the quality testing concepts and more with this practice test.

  • Who can take up this Six Sigma Green Belt exam?

    This Six Sigma Green Belt Practice test is ideal for the candidates who wish to appear for the Lean Six Sigma Green Belt certification exam conducted by IASSC.

  • What will I learn from this six sigma green belt question bank?

    This free practice test helps you determine the depth of your understanding of core principles of Lean Six Sigma and how to implement quality applications and projects. The Six Sigma Green Belt question bank allows you to reinforce your thorough study of the quality testing domain and gain the confidence to perform better in the actual exam.

  • What are the requirements to take this practice test?

    The learners need not fulfill any requirement to take the Six Sigma Green Belt Practice test.

  • Will the Practice Tests be updated frequently?

    We are responsive to every new change in the topics covered in the practice test questions and learners can see that reflected in our questions from time to time.

  • Will this practice test helps in clearing the actual certification exam?

    Taking this Six Sigma Green Belt test proves valuable as it allows you to track your performance in the various areas of Six Sigma. Though it does not assure your success, it helps you to practice the time planning required to appear for the IASSC’s Lean Six Sigma Green Belt certification exam.

  • What is included in this practice test?

    There are 100 Six Sigma Green Belt exam questions included in the 180 minutes practice test. These MCQs questions can be attempted in one go or the test can be paused to be continued later as well.

  • Can I retake this Practice Test?

    Yes, you are allowed to re-attempt the six sigma green belt test as per your need. To get the overall benefit, you are advised to take the test only after rigorous preparation.

  • Are these the same questions I'll see on the real exam?

    We are dedicated to providing a simulated testing environment through this practice test and it involves questions that are most expected to be faced by the learners on the actual exam conducted by IASSC.

  • I didn’t do well on this practice test. What should I do now?

    The Six Sigma green belt exam questions and answers can be tried as many times as you like. The test helps you zero in on areas of weakness and you can prepare it better through our Lean Six Sigma Green Belt Certification Training course before taking the next attempt.

  • Disclaimer
  • PMP, PMI, PMBOK, CAPM, PgMP, PfMP, ACP, PBA, RMP, SP, and OPM3 are registered marks of the Project Management Institute, Inc.

Request more information

For individuals
For business
Name*
Email*
Phone Number*
Your Message (Optional)
We are looking into your query.
Our consultants will get in touch with you soon.

A Simplilearn representative will get back to you in one business day.

First Name*
Last Name*
Email*
Phone Number*
Company*
Job Title*